The Hon. Member for Onchan (Mr Callister) to ask the Minister for Infrastructure:

How much waste was incinerated at the Energy from Waste Plant in 2017-18 in (a) the primary incinerator; and (b) the secondary incinerator?

Link to page 39 Hansard